Week 26 - Daily Log
Continuing the detailed daily logging format. Each day’s work and learning outcomes are tracked in separate files for clarity and granularity.
Table of Contents
- Day 1 - March 09, 2026
- Day 2 - March 10, 2026
- Day 3 - March 11, 2026
- Day 4 - March 12, 2026
- Day 5 - March 13, 2026
- Day 6 - March 14, 2026
Overview
This week focuses on the AnanaCare Relabel project, with emphasis on automating the setup process, migrating the frontend to SvelteKit, and building the foundation for the Expert-in-the-Loop Relabeling Module.
Week 26 Summary
- Day 1 (Mar 09): Centralized logging, cleaned terminal output, migrated frontend to SvelteKit, fixed image LFS issues, improved tooltip UX, and scaffolded Docker compose + front-end builds.
- Day 2 (Mar 10): Merged
v2intomain, restored SvelteKit frontend (favicon + accessibility fixes), and extended backend loader to auto-detect new label columns (R_10,R_11). - Day 3 (Mar 11): Audited SvelteKit migration, updated README, and implemented parallel hyperparameter tuning support (
--job-id,--trials-per-job, HF sync improvements). - Day 4 (Mar 12): (No log file present; check for missing entry or incomplete note.)
- Day 5 (Mar 13): Pivoted toward an in-graph reference system, designed
.state/references.jsonpersistence, and outlined Reference Selection vs. Relabel modes. - Day 6 (Mar 14): Deployed the Relabeling Module + local RAG Vault on client hardware, configured Docker/pgvector persistence, established Cloudflare Tunnel for frontend/backend, and validated local embedding performance.
Daily Work Logs
See the sidebar or the links above for each day’s detailed log.